Action Plan Following an Environmental Audit: A Step-by-Step Guide

environmental audit action plan

Industrial Management Action Plan Following an Environmental Audit: A Step-by-Step Guide Publication date: October 2026 An action plan following an environmental audit is the document that turns each finding into a preventive or corrective measure, with its cause, owner, deadline, and evidence showing that it has been resolved. Its format varies depending on the type […]

Extended Producer Responsibility Mexico: EPR Guide

Extended producer responsibility Mexico

Sustainability in the industry What Is Extended Producer Responsibility? Sustainability Isn’t Measured by the Packaging Publication date: October 2026 Extended Producer Responsibility, or EPR (REP in Mexico), is the obligation of a company that manufactures or imports a product to take responsibility for its environmental impact throughout the product’s life cycle—from raw materials to what […]

Sustainability Checklist for Suppliers: SAQ 5.0, EcoVadis and CDP. In Mexico, the questionnaire assesses evidence, not intention.

Sustainability Checklist for Suppliers: SAQ 5.0, EcoVadis and CDP

Sustainability in the industry Sustainability Checklist for Suppliers in Mexico The questionnaire scores evidence, not intent Publication date: October 2026 A supplier can answer “yes” to every question on a sustainability questionnaire and still receive a low rating. The reason is almost always the same: the claims aren’t supported by evidence the evaluator will accept.This […]

Environmental Impact Assessment in Guanajuato: Three Inboxes and a Project Start Date

Environmental Impact Assessment in Guanajuato

Environmental Management Environmental Impact Assessment in Guanajuato Three Inboxes and a Project Start Date Publication date: October 2026 An industrial project’s environmental application can fall apart for two reasons, neither of which has to do with filling out the form incorrectly. This article explains how the competent authority is determined in the Bajío region, why […]

The Hidden LOTO Metric: How poor machine design encourages accidents

The Hidden LOTO Metric

Industrial Safety The Hidden LOTO Metric How poor machine design encourages accidents Publication date: September 2026 According to the agency’s own estimates, lockout prevents 122 deaths and 60,000 injuries every year. It is not a prohibition; it is a decision framework with five legitimate pathways. Which pathway applies to a given task? What does NOM-004 […]

How to Prevent Heat Stress Under NOM-015-STPS-2001

How to Prevent Heat Stress Merida

Workplace health and well-being How to Prevent Heat Stress Under NOM-015-STPS-2001 Publication date: August 2026 In Mérida and much of the Yucatán Peninsula, thermal conditions are determined by more than air temperature. The combination of sensible heat, high relative humidity, and—often—radiant heat from roofs, equipment, or exposed surfaces creates a thermal load that workers’ bodies […]

Hydraulic Engineering in Karst Terrain: Why NOM-001-SEMARNAT-2021 Requires a Different Approach in Yucatán

Hydraulic engineering in karst soil: why NOM-001-SEMARNAT-2021 Yucatán

Industrial Management Hydraulic Engineering in Karst Terrain: Why NOM-001-SEMARNAT-2021 Requires a Different Approach in Yucatán Publication date: August 2026 The Yucatán Peninsula has one of Mexico’s most distinctive geological formations. Its limestone platform, shaped over millions of years, has created a system of aquifers, cenotes, and underground conduits that defines not only the landscape but […]